VAT Return done, and paid, so the heat is off for a little while, and I can concentrate on the important things. So, here's the list:
Finish 2 toiles for the Sew Along, and choose fabric. I've made progress with the stretch one, and the fit is now good, and techniques worked out. Woven is cut out and darts done, that's it.
Some mending for Lilya, torn dress (done), sew bobble on her favourite scarf, elastic on ballet shoes.
Knitting, one onesie done (thanks Cat), apart from embellishment, one on the needles, the other in planning.
Peter Rabbits need to be finished for Easter. So far, one has been dismantled due to the head being on the wrong way, halfway through knitting the second, third not even started....
Crochet. New GChild will need a Nana-made blanket, so this needs to be addressed.
Whew, better get cracking!!
Jessie
Eta: Need to start a Crochet thread......